Standard

SSPC QS 1

Published

Note: This standard has a new edition: SSPC QS 1

Singles purchase not accessible

This standard can not be purchased as a single sales.

Abstract

SSPC-QS 1 requires a coating contractor to implement and document advanced quality control and recordkeeping procedures. As such, the requirements of this standard are intended to supplement the requirements of SSPC-QP 1, SSPC-QP 3, SSPC-QP 6, and SSPC-QP 8. Owners and specifiers who require a higher level of quality control for their projects have the option to require that a contractor qualified to QP 1, 3, 6, or 8 also present evidence that its quality system meets the requirements of QS 1 on projects where an SSPC-QS 1 certification or an equivalent advanced quality management system is required. The objective of this standard is to confirm that a contractor has the personnel, organization, qualifications, procedures, knowledge, and capability to implement the QS 1 quality procedures.  The standard encompasses the in-process inspection of surface preparation, application and cure of protective coatings and linings for new construction and maintenance for industrial, commercial, and marine service.

Document information

  • Standard from SSPC_AC
  • Published:
  • Version: 0
  • Document type: IS