Consolidated

NEK IEC 61850-7-410:2012+A1:2015 CSV

Published

Corrigendums and amendments are bought separately.

Language
Services

Abstract

IEC 61850-7-410:2012+A1:2015 specifies the additional common data classes, logical nodes and data objects required for the use of IEC 61850 in a hydropower plant. The main changes with respect to the previous edition are as follows:- the logical nodes in IEC 61850-7-410:2007 that were not specific to hydropower plants have been transferred to IEC 61850-7-4:2010;- the definitions of logical nodes in this edition of IEC 61850-7-410 have been updated;- most of the modelling examples and background information included in IEC 61850-7-410:2007 have been transferred to IEC/TR 61850-7-510.This new edition of IEC 61850-7-410 includes additional general-purpose logical nodes that were not included in IEC 61850-7-4:2010, but are required in order to represent the complete control and monitoring system of a hydropower plant. This consolidated version consists of the second edition (2012) and its amendment 1 (2015). Therefore, no need to order amendment in addition to this publication.

Document information

  • Consolidated from NEK
  • Published:
  • Edition: 2.1
  • Version: 1
  • Document type: NAT
  • Pages
  • ICS 33.200
  • National Committee NEK/NK57

Product Relations