It is currently not possible to order printed and bound versions of standards. This is due to challenges related to our printing supplier. We are working to resolve the situation and apologize for any inconvenience this may cause. For other options, contact salg@standard.no.
Standard

NS-EN 16907-3:2018

Published

Corrigenda and amendments are bought separately.

Language
Services

Abstract

This European Standard provides execution procedures for excavating, transporting and placing soils and rocks for the construction of earth-structures and guidance for the work. Additionally, it includes excavation and placement of rock materials underwater. Dredging of soils and the associated hydraulic placement of fills are covered by EN 16907-6 and EN 16907-7. Execution of earthworks follows the conclusions of the earthworks design and optimization phase (EN 16907-1), which should anticipate soil and rock specificities and their suitability. In case some events could not be foreseen, additional design is performed during the execution of works.

Document information

  • Standard from SN
  • Published:
  • Edition: 2018-12
  • Version: 1
  • Document type: NAT
  • ICS 93.020
  • National Committee SN/K 415

Product Relations

  • Adopted from: EN 16907-3:2018 , 0